The lifecycle, with this repository as the worked example

The board → · 31 rows · filter by Phase, Kind, or any of three vocabularies

Most lifecycle diagrams are generic enough to be true of anything and therefore useful for nothing. This one is different in one way: every row points at a file, a workflow, a board or a thread that exists in this repository. The stages are the same eight any retrieval or evaluation project goes through. The rows are what this project produced at each one.

The eight phases, and what each hands to the next

Phase What has to be true to leave it The artefact this repo produced
0 · Frame The constraint that makes it hard is written down, with a falsifier An ADR template where What would change this is a required section
1 · Discover You have read the corpus, not a summary of it A corpus spec: track T1's capstone — what is in scope, what the retrievable unit is
2 · Specify An eval set exists with gold evidence, nulls at the real base rate, a pre-registered primary metric, and a noise band measured on the unchanged system Notebook 02, eval-baseline.json, the measurement PR template
3 · Design Every non-obvious choice has an ADR naming the alternative that lost, and a review has said which parts survive Eight ADRs, the Design Reviews category, the review checklist
4 · Build Each change moves one number and ships with its interval; the reference solution passes its own hidden checks and the starter does not labs/test_labs.py in CI; the four challenge shapes in the L.A.B. simulator
5 · Validate The primary metric clears the band; every slice clears its own; the judge is calibrated with κ and its base rate; the frozen slice agrees with dev The release gate playbook; lab L12, which is that gate as code
6 · Release A written decision — ship, do not ship, or not yet measurable — that someone outside the room can audit; branch protection on exactly the checks that run on every PR; untrusted input never reaches a shell ADR-0008; the three-job discussion-lab.yml
7 · Operate Failures are reproducible after the fact; postmortems name the detection gap; what needs attention is on one board L11's trace, the postmortem template, the Repo Pulse and Hands-on Tracker boards

The dependency is real, not decorative. L12 cannot be completed without T4's noise band, T5's calibrated judge, T6's cost model and T7's trace — the lab DAG enforces the lifecycle because that dependency is the lesson.

Four kinds of row

Kind What it is Example on the board
Artefact A thing a phase produces and the next phase consumes An eval set with gold evidence, not just gold answers
Gate A condition that must hold before you may leave the phase Every slice clears ITS OWN band
Practice A habit worth naming because its absence is how projects fail Rule out configuration before suspecting design
Signal An observable that tells you a phase is actually done, or has quietly come undone Gate override rate under one in ten

Gates are what most lifecycle documents omit, and they are the only rows that stop you doing something. A lifecycle with no gates is a reading list.

The same board in three other vocabularies

Teams arrive with a method already in their heads. Rather than argue, every row is also tagged with where it sits in three of the current ones, so the board reads in whichever you use.

AiDD — AI-Driven Development, six units. Intent before implementation is phase 0–2 here: the constraint, the spec, the eval set — written before a model is asked for anything. Context as an asset is the corpus you actually read, the trace, the FAQ that links rather than copies. Right-sized process is the pre-registered metric and the noise band: enough rigour that a number means something, and no ceremony past that. Slicing the work is one number per PR. The review seam is every gate. Reading the failure is the four verdicts, the detection gap, and the grid search in #4 that lost — which is what promoted the diagnosis from weights to features.

BMAD — Analysis, Planning, Solutioning, Implementation. Phases 0–1 are Analysis; 2 is Planning; 3 is Solutioning; 4–7 are Implementation. BMAD's distinctive move is the agentic hand-off between roles with a written artefact at each seam — which is exactly what the Artefact rows are, and why they are named as things rather than as activities.

AI-DLC — Inception, Construction, Operations. Inception is 0–3, Construction 4–5, Operations 6–7. AI-DLC's emphasis is that Operations is not an afterthought: the trace, the pulse board and the tracker are designed in phase 7's rows, not bolted on after release.

The mapping is deliberately loose at the edges. A gate like the judge is calibrated sits in Validate here, in Implementation for BMAD, in Construction for AI-DLC — and it is the same row. The vocabularies differ on where to draw lines; they agree on what has to be true.

What this board is for

  • Starting a similar project: read down the Artefact column. That is the deliverable list.
  • Reviewing one: read the Gate rows. Ask which ones have been passed and how you would know.
  • Explaining why this repo is shaped the way it is: every row's In this repo field is the reason that file or workflow exists.
  • Arguing with it: open a thread in Design Reviews. Several rows are opinions with evidence attached, and evidence is the only thing that moves them.