SkyWaysThe agentic manual

The agentic PDLC for product managers: what changes Monday

Your influence moves upstream. The slow part of building is no longer the building. It is deciding precisely what right means, and who may act.

6 minutesBeginnerLesson 1 of 9Updated By

On this page
  1. Sound familiar?
  2. What changes for a product manager?
  3. Your eight steps
  4. What is yours, and what is not
  5. How to use a model in this role
  6. Where you'll use it
  7. Why it matters
  8. Try it
  9. Key takeaways
  10. FAQ
  11. Apply it in your role
  12. Sources and credits
All lessonsStart here

Getting started

  1. What is the agentic PDLC?
  2. How this tutorial works

Agentic PDLC fundamentals

  1. The evolution of the PDLC
  2. Why agentic AI projects fail
  3. P0 · Frame
  4. P1 · Design & Spec
  5. The one hard gate
  6. P2 · Build & Prove
  7. P3 · Run & Learn
  8. The eight loops
  9. The evidence pack

Methods decoded

  1. AI-DLC vs AIDD vs agentic SDLC
  2. What is AI-DLC?
  3. What is AIDD?
  4. What is the BMAD Method?
  5. What is spec-driven development?
  6. One lifecycle for every method
  7. How much process a change needs

Running delivery

  1. How to run an agentic AI project
  2. Bolts vs sprints
  3. A board for agentic work
  4. Cut delivery from months to weeks
  5. Review AI code by risk
  6. How accurate must an agent be?
  7. Prove the agent meets its bar
  8. Shadow mode and cut-over
  9. Why the AI bill is 4× the estimate
  10. Guardrails that hold
  11. The five governance gates
  12. Catch AI drift
  13. AI incident postmortems

By role

  1. For product managers
  2. For program managers
  3. For solution architects
  4. For engineers
  5. For forward-deployed engineers
  6. For QA
  7. For DevOps and platform
  8. For business sponsors
  9. For executives

Teams and organisation

  1. Team structure for agentic AI
  2. Measuring AI productivity
  3. The maturity model
  4. Rolling it out in 90 days

Practice

  1. The SkyWays case study
  2. The operating rhythm
  3. The workbench
  4. Twelve exercises

Interviews and careers

  1. What is an FDE?
  2. Six answer frameworks
  3. AI PM interview questions
  4. FDE interview questions
  5. GenAI engineer questions
  6. Agentic engineer questions
  7. AWS GenAI questions

In short

In the agentic PDLC the product manager turns requests into measured pains, decides which work is genuinely AI work, and sets autonomy one action at a time. They derive the acceptance bar for each slice from what a mistake costs, own the intent and release gates, and report what the feature saved beside what it cost. They stop approving anything they cannot evaluate.

The product manageracross the four phasesP0Frameyours to lead1 · Discoverthe vibe, measured2 · Qualifyis it AI at all?3 · Framevalue and autonomyP1Design & Spec4 · Specifyeight fields, one screen5 · Planbolts, not sprintsP2Build & Prove6 · Gateyour three gatesP3Run & Learn7 · Launchshadow, 5%, widen8 · Learntwo numbers, next frameThe product manager leads P0 and holds three gates in P2. What and why stay yours; how right it must be becomesa number per slice.

The product manager across the four phases

P0Frameyours to lead
  • 1 · Discoverthe vibe, measured
  • 2 · Qualifyis it AI at all?
  • 3 · Framevalue and autonomy

P1Design & Spec
  • 4 · Specifyeight fields, one screen
  • 5 · Planbolts, not sprints

P2Build & Prove
  • 6 · Gateyour three gates

P3Run & Learn
  • 7 · Launchshadow, 5%, widen
  • 8 · Learntwo numbers, next frame

The product manager leads P0 and holds three gates in P2. What and why stay yours; how right it must be becomes a number per slice.

In this lesson you'll learn:

  • the eight steps a product manager takes across the four phases, and what each leaves behind;
  • what is yours to own now, and what you should stop signing;
  • how to use a model in the role, and the judgements it must never make for you.

Sound familiar?#

  • You are asked to approve pull requests you cannot read, and to sign off a demo you cannot fault.
  • The business case says "significantly faster", and finance will ask for a number next quarter.
  • Three stakeholders want three different things from "the assistant", and the meeting has run for two weeks.

The role has not disappeared; its centre of gravity has moved. The work that decides whether an agentic product succeeds now happens before anything is built.

What changes for a product manager?#

You stop approving pull requests, and start deriving the bar from what a mistake costs. When agents write the code, the slowest part of building is deciding exactly what to build and what counts as right, and a coding agent cannot ask you what you meant. So the discipline you always had becomes mandatory: the pain is a measurement, the spec is exact, and "good enough" is a number per slice.

the specit cannot askcuts what is pinned
A coding agent builds exactly what the spec says and cannot ask what you meant. The deciding happens before the cut.

Your eight steps#

P0 · Frame: the phase you lead#

1 · Discover. Turn the request into one line: who, how often, what it costs, the evidence. At SkyWays, "make rebooking smarter" became 240 disrupted passengers a day, 38 minutes each, $9.40 a case. 2 · Qualify. Three questions (judgement, volume, recoverability) and expect two or three of your top five to be rules. 3 · Frame. A value line net of running and checking it, and autonomy set per action from what a mistake costs. P0 Frame

P1 · Design & Spec#

4 · Specify. Eight fields on one screen; the five agentic ones are the decisions nobody made. The eight-field spec 5 · Plan. You set the cadence (how often evidence arrives); the architect sets the cut. Bolts vs sprints

P2 · Build & Prove#

6 · Gate. Five gates exist and three are yours: intent, release, and plan shared with the architect. Behaviour and expansion are QA's. Strike every approval you cannot evaluate. The five gates

P3 · Run & Learn#

7 · Launch. Shadow, then 5%, then wider, earned by evidence, never by a date. Shadow and cut-over 8 · Learn. Two numbers on one line, every cycle, before anyone asks, and every incident turned into the brief for the next P0.

What is yours, and what is not#

Yours to ownNot yours: stop signing these
The intent and release gates, and the plan gate with the architectThe behaviour and expansion gates: QA's
Autonomy per action, and the door it sits behindPull requests you cannot evaluate
The acceptance bar per slice, derived rather than guessedModel choice, temperature, framework: behaviours are yours, knobs are engineering's
The two-number report to whoever funds the workThe golden set's contents: you set the bar, QA curates the cases

How to use a model in this role#

Use a model for the drafting and the arithmetic, never for the judgement. It can turn six interview transcripts into a deduplicated pain register in a minute, and it will happily invent a value line if you let it. You bring the numbers and the decision; the model brings the structure and the first draft; every artefact leaves your hands having been read by you. What it must not decide: what a mistake costs your business, and which actions may happen without a person.

Where you'll use it#

  • On Monday: write the pain line for the feature in front of you, with a number and a source.
  • At the next steering meeting: recast "how much should the assistant do?" as a table of actions.
  • At every release: the two numbers, on one line, from you rather than from finance.

Why it matters#

When agents write the code, the product manager who can write an executable specification (exact, small, with a bar per slice) is the most valuable person in the room. The one who approves pull requests and signs demos is the least, and is also where most agentic projects lose control of what they are building.

Try it#

A stakeholder asks you to approve a change that raises the agent's refund cap from $400 to $600 "to reduce escalations". Which of your steps does this touch, and what do you ask for before deciding?

Show the answer

Step 3 (autonomy) and step 6 (the plan gate). Raising a money cap changes the autonomy of a consequential action, which is yours. Ask for the evidence: how many escalations sit between $400 and $600, what a wrong refund in that band costs, whether the bar for refunds is re-derived at the new damage, and whether the new cap will be enforced in the tool's signature with its tests, not only in the prompt. Then decide, and record it with a named approver.

Key takeaways#

  1. Your influence is upstream: measured pain, AI-fit, autonomy per action, and a derived bar.
  2. Three gates are yours (intent, release and plan) and approvals you cannot evaluate are not.
  3. Report two numbers every cycle, and let the model draft while you decide.

FAQ#

What does a product manager do in an AI project?#

Frames the problem as a measured pain, decides whether it genuinely needs AI, sets how much the agent may do on its own per action, derives the accuracy bar for each kind of case from what a mistake costs, writes the spec, owns the intent and release decisions, and reports value beside cost after launch.

How is AI changing product management?#

It moves the product manager's influence upstream. Implementation is faster, so the bottleneck is deciding precisely what to build and what counts as right. Writing requirements a machine can build from, and bars derived from money, become core skills.

Should product managers approve AI-generated code?#

No. Approving pull requests you cannot evaluate adds a name without adding a check. Code review belongs to engineering by risk band; the product manager's decisions are intent, autonomy, the bar and release.

What skills does an AI product manager need?#

Turning a vague request into a measurement; knowing when a problem is not AI; setting autonomy per action from reversibility; deriving acceptance bars from damage and saving; writing precise, small specs; and reporting cost beside value. Most are old product skills made mandatory.

Apply it in your role#

If you are…Do thisThe AI-augmented shortcut
A forward-deployed engineerAt a small customer you are often the PM as well: measure the pain, run the AI-fit, and get autonomy per action signed by someone who owns the risk.Ask a model to interview you as the customer's PM, and write the pain register from your answers.
A product manager or FDPMYour Monday: one pain measured, one bar derived, one approval you cannot evaluate removed. As an FDPM, add a fourth: sort each customer request into configuration, service or product.Have a model classify last quarter's customer requests that way, with the evidence of a pattern behind every "product".
A GenAI or agentic AI engineerAsk the PM for the bar per slice and autonomy per action before you build. If they are missing, draft them and ask for a signature.Ask a model to draft the bar sheet from the spec, for the PM to correct rather than write.

Across the enterprise. Define the AI PM's artefacts centrally (pain register, AI-fit record, bar sheet, autonomy record) so product managers in every team are judged on the same evidence.

The ten-minute workflow. A pain line that survives to the steering committee:

Interview me about the problem our AI feature is meant to solve. Ask one question at a time, and keep
going until you can write one line: "<who> waits <minutes> for <what>; <n> cases a day; <share> are
<the hard slice>; measured cost <$> a case, from <source>." Do not supply any number I have not given
you; mark it UNKNOWN instead.

Sources and credits#

IdeaOriginSource
The product manager's eight steps, owns and not-yoursOriginal: this manualProduct manager, end to end · Role: Product manager
The shift: stop approving pull requests, start deriving the barOriginal: this manualFor leadership
The SkyWays examplesIllustrative: a fictional airlineJourney: Product manager

Prefer GitHub? This track is on the wiki, and this lesson is markdown. Found a mistake? Edit this lesson, or say so.