Agentic PDLC for program managers: boards, bolts, reporting

You do not own a phase. You own the system the phases run in, and the waits between them, which is where agentic programmes lose their weeks.

7 minutesBeginnerLesson 2 of 9Updated By

On this page
  1. Sound familiar?
  2. What changes for a programme manager?
  3. Your eight moves
  4. What is yours, and what is not
  5. How to use a model in this role
  6. Where you'll use it
  7. Why it matters
  8. Try it
  9. Key takeaways
  10. FAQ
  11. Apply it in your role
  12. Sources and credits
All lessonsStart here

Getting started

  1. What is the agentic PDLC?
  2. How this tutorial works

Agentic PDLC fundamentals

  1. The evolution of the PDLC
  2. Why agentic AI projects fail
  3. P0 · Frame
  4. P1 · Design & Spec
  5. The one hard gate
  6. P2 · Build & Prove
  7. P3 · Run & Learn
  8. The eight loops
  9. The evidence pack

Methods decoded

  1. AI-DLC vs AIDD vs agentic SDLC
  2. What is AI-DLC?
  3. What is AIDD?
  4. What is the BMAD Method?
  5. What is spec-driven development?
  6. One lifecycle for every method
  7. How much process a change needs

Running delivery

  1. How to run an agentic AI project
  2. Bolts vs sprints
  3. A board for agentic work
  4. Cut delivery from months to weeks
  5. Review AI code by risk
  6. How accurate must an agent be?
  7. Prove the agent meets its bar
  8. Shadow mode and cut-over
  9. Why the AI bill is 4× the estimate
  10. Guardrails that hold
  11. The five governance gates
  12. Catch AI drift
  13. AI incident postmortems

By role

  1. For product managers
  2. For program managers
  3. For solution architects
  4. For engineers
  5. For forward-deployed engineers
  6. For QA
  7. For DevOps and platform
  8. For business sponsors
  9. For executives

Teams and organisation

  1. Team structure for agentic AI
  2. Measuring AI productivity
  3. The maturity model
  4. Rolling it out in 90 days

Practice

  1. The SkyWays case study
  2. The operating rhythm
  3. The workbench
  4. Twelve exercises

Interviews and careers

  1. What is an FDE?
  2. Six answer frameworks
  3. AI PM interview questions
  4. FDE interview questions
  5. GenAI engineer questions
  6. Agentic engineer questions
  7. AWS GenAI questions

In short

In agentic delivery the programme or delivery manager owns the system the phases run in rather than any one phase. That system is the evidence board, the daily cadence, the log of open decisions with owners and dates, and the review queue. It is also the lead-time items started on day one, the conditions (not dates) for each gate, and the two-number report the sponsor reads.

The programme manageracross the four phasesP0Frame1 · Board and baselineperson-days per story, now2 · Lead timesrequested in week oneP1Design & Spec3 · Decision loghard or soft, owner, date4 · Cadenceand an integration dateP2Build & Prove5 · Daily rhythmone question at standup6 · Review queueslots, not ticketsP3Run & Learn7 · Gate conditionsevidence, never dates8 · Two numbersand the maturity checkThe programme manager owns the board, the cadence and the review queue, and reports evidence, never dates.

The programme manager across the four phases

P0Frame
  • 1 · Board and baselineperson-days per story, now
  • 2 · Lead timesrequested in week one

P1Design & Spec
  • 3 · Decision loghard or soft, owner, date
  • 4 · Cadenceand an integration date

P2Build & Prove
  • 5 · Daily rhythmone question at standup
  • 6 · Review queueslots, not tickets

P3Run & Learn
  • 7 · Gate conditionsevidence, never dates
  • 8 · Two numbersand the maturity check

The programme manager owns the board, the cadence and the review queue, and reports evidence, never dates.

In this lesson you'll learn:

  • the eight things a programme manager runs across the four phases of agentic delivery;
  • how to report progress when "code complete" is roughly the halfway point;
  • which decisions are yours to chase and which are never yours to make.

Sound familiar?#

  • The status report says green every week, and the launch still slips by a month.
  • A decision has been "being discussed" for three weeks, and the build is quietly working around it.
  • The plan has a launch date, and nobody has computed how long the canary needs.

In agentic delivery most of the lost time is waits between the phases, not work inside them, and the waits belong to nobody unless they belong to you.

the work: hoursthe wait: weeksnobody's, so yours
Agents build a story in hours. The weeks go in the waits between phases, which belong to nobody unless they belong to you.

What changes for a programme manager?#

You stop tracking tasks to done, and start tracking evidence to decisions. When agents build a story in hours, work is rarely the bottleneck. The waits are: a decision nobody owns, a review queue, an access request made late, a canary that needs more traffic than the date allows. The role becomes making those waits visible, owned and short.

Your eight moves#

P0 · Frame#

1 · Set up the board, and take the baseline. An evidence board with risk-band swimlanes, and, before anything changes, person-days per story today. It takes an afternoon and cannot be recovered later. The board 2 · Start the lead-time items. Model access per model and per region, data-export approvals, security review: requested in week one, whatever the plan says.

P1 · Design & Spec#

3 · Run the decision log. Every open decision, classified hard or soft, each with an owner and a date; soft ones name their placeholder. A decision with no owner is the most useful thing you can find. The hard gate 4 · Agree the cadence. With the product manager and the architect: how often evidence arrives, usually daily, and the integration deadline that goes with it.

P2 · Build & Prove#

5 · Run the daily rhythm. Standup asks two things: did yesterday's bolt integrate, and what is today's one unknown? The demo is daily, from what merged. Bolts vs sprints 6 · Watch the review queue. Count review in slots, not tickets; queue time is slots needed ÷ slots cleared a day. When it passes two days, the policy is the problem. Review by risk

P3 · Run & Learn#

7 · Schedule gates by condition, not by date. The shadow window is fixed in advance; each widening names its evidence; the rollback is rehearsed with a stopwatch before cut-over. Put the evidence days (cases needed ÷ cases per day at the canary share) in the plan. Cut delivery time 8 · Assemble the two numbers, and run the maturity check. The saving beside the spend, with review hours and re-runs, every cycle; and each quarter, the six-control check with the first missing control named. Maturity

What is yours, and what is not#

Yours to runNot yours to make
The board, the cadence and the daily rhythmThe acceptance bar: the product manager derives it
The decision log: owners, dates, placeholdersThe decisions themselves: you chase them, their owners make them
The review queue and the lead-time itemsThe risk band of a change: the path rule decides it
Gate conditions and the rollback rehearsal on the calendarWhether a slice has earned wider use: QA's call
Assembling the two-number reportSigning it: the sponsor is accountable

How to use a model in this role#

Let a model assemble the daily note from the merge log and the harness output (what merged, which slice ran, what it scored) in thirty seconds instead of ten minutes, and draft the weekly report from the board. Do not let it summarise a decision as made when it is only discussed, or turn a lower bound into a pass: read every number it reports against its source.

Where you'll use it#

  • In the first week of any agentic programme: board, baseline, lead-time requests.
  • Every morning: the two standup questions and the daily demo.
  • Every week and every cycle: the review queue, the decision log, and the two numbers.

Why it matters#

A status report built on tasks says green while an agentic programme slips, because tasks finish fast and evidence does not. A report built on evidence (what merged, what is proven, what is waiting on whom) shows the slip the week it starts, when it is still cheap to fix.

Try it#

Your programme has: a spec signed last week; a framework choice "still being evaluated" with no owner; model access requested in one region but the data must stay in another; a canary planned at 5% of 300 cases a day with 600 cases needed. List what you do this week.

Show the answer

Four things. Give the framework decision an owner and a date, and a placeholder (an interface layer) so the build can proceed. Request model access in the region the data must stay in, today. Put the canary's length in the plan: 600 ÷ (5% × 300) = 40 days, and ask whether a wider share is acceptable for low-risk actions. And confirm the board's Specified column shows the signed spec, bar and authority budget, so the hard gate is visible as passed.

Key takeaways#

  1. You own the system and the waits, not a phase: board, cadence, decisions, queue, lead times.
  2. Track evidence to decisions, and put gate conditions, never bare dates, in the plan.
  3. Assemble the two numbers every cycle and the maturity check every quarter.

FAQ#

What does a program manager do in an AI project?#

Runs the delivery system around the phases: an evidence-based board, a daily cadence, a log of open decisions with owners and dates, the review queue, the early requests for access and approvals, gate conditions on the calendar, and the report of value beside cost that the sponsor reads.

How do you report progress on an AI agent project?#

By evidence, not tasks: what merged and integrated each day, which slices are proven against their bars, what is in shadow or live and what earned it, what is waiting on which decision, and the saving beside the spend. Code complete is roughly the halfway point.

How do you manage risk in an agentic AI project?#

Keep a decision log that classifies each open decision as hard (settled before its phase closes) or soft (running behind a placeholder with an owner and a date), and chase the owners. Most schedule risk is a decision nobody owns; most product risk is a limit that lives only in a prompt.

Do agentic projects still need a delivery manager?#

Yes. Agents shorten the building; they do not shorten decisions, review queues, access requests or the time live traffic takes to produce evidence. Someone has to own those waits.

Apply it in your role#

If you are…Do thisThe AI-augmented shortcut
A forward-deployed engineerAcross several customer deployments you are running a programme: one board, one decision log and one review-queue number per customer.Ask a model to merge every customer's status into one programme view, blocked decisions first.
A product manager or FDPMGive the programme manager your gate conditions in writing. They become dates only when the evidence arrives.Have a model turn the gate conditions into a milestone plan triggered by evidence, not by dates.
A GenAI or agentic AI engineerKeep the integration deadline honest by publishing same-day integration and the review queue every day.Ask a coding agent for a daily job that posts both numbers to the team channel.

Across the enterprise. A programme office for AI delivery tracks decisions, lead times and evidence across teams. The review queue and the blocked decisions are its critical path, not the build.

The ten-minute workflow. A decision log, pulled from the week's noise:

Here are this week's meeting notes and chat excerpts: <paste>. Extract every decision made or deferred.
For each: the decision, hard or soft (can it be reversed cheaply once building starts?), the owner, the
date it is due, and what is blocked until it is made. List decisions with no owner first.

Sources and credits#

IdeaOriginSource
The programme manager's eight moves, as a roleOriginal: this tutorial, assembled from this manual's roles and gatesGates and Governance
The daily note from the merge logOriginal: this manualHow to cut sprints into bolts
Queue time = slots needed ÷ slots per dayBorrowedLittle, J. D. C. (1961). Operations Research 9(3)
Visualise work and limit work in progressBorrowedAnderson, D. J. (2010). Kanban. Blue Hole Press
The SkyWays figuresIllustrative: a fictional airlineThe workbench

Prefer GitHub? This track is on the wiki, and this lesson is markdown. Found a mistake? Edit this lesson, or say so.